Velleman KNS3 Manuale Utente Pagina 2

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 9
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 1
KNS3 - 2 - VELLEMAN
3. Prepunched Boards
4. Assembly
The gears (P4-7) should be placed to the left of the pinion gear (P3). Put one N-shaped nylon connector (P12)
downward and another one upward. Note that the protruding edge should point towards the metal case.
Screw a fixing plate P29 to boards B and C and fix them to board A. Then screw the gearbox onto board A.
Fig.2
Fig.3
Fig.4
Vedere la pagina 1
1 2 3 4 5 6 7 8 9

Commenti su questo manuale

Nessun commento